DreamLine DL-6995-01CL Installationsanleitung

Stöbern Sie online oder laden Sie Installationsanleitung nach Nein DreamLine DL-6995-01CL herunter. DreamLine DL-6995-01CL Installation Guide Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 36
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Visions Tub Door & QWALL-TUB Kit
Tub Door AND SHOWER BACKWALLS KIT INSTALLATION
INSTRUCTIONS
IMPORTANT
DreamLine
TM
reserves the right to alter, modify or redesign products at any time
without prior notice. For the latest up-to-date technical drawings, manuals or any
other details please refer to the support.BathAuthority.com web page.
STEP 1: Install Shower Backwalls
Shower Backwalls Installation Instructions
STEP 2: Install Shower Door
Shower Door Installation Instructions
Please read these instructions carefully before installing. If you have any questions regarding
installation, please call our technical support specialists Monday through Friday 9:00 AM 5:00
PM EST at Phone: 1-866-731-2244, Fax: 1-866-227-1533 or e-mail our technical support
group at
For more information on DreamLine Shower Kit please visit www.BathAuthority.com
Seitenansicht 0
1 2 3 4 5 6 ... 35 36

Inhaltsverzeichnis

Seite 1 - QWALL-TUB Kit

Visions Tub Door & QWALL-TUB Kit Tub Door AND SHOWER BACKWALLS KIT INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to

Seite 2 - IMPORTANT

Rev 1.6 9 NOTE: Glass Door (04) comes with preinstalled Wheel assemblies (17). If not, please refer to (Fig. 11) for detailed installation. 12. Faste

Seite 3 - Tools Required

Rev 1.6 10 14. Install the Handles (06) to the Glass doors (04). Press the anti-water strips (08) on the vertical edges of the Stationary glasses (05

Seite 4

Rev 1.6 11 16. Apply the sealant along the profiles and guide rails; on the seams between the bottom guide rail and the profiles as well as along the

Seite 5 - Shower Door Installation

QWALL TUB TUB ACRYLIC BACK WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any tim

Seite 6 - Fig. 3

Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in the packag

Seite 7

Detailed Diagram of Tub Back Wall Components 12437589106 Packing List 01 Side panel 2pcs 06 Wall anchor 21pcs 02 Back panel 2pcs 07 Countersunk

Seite 8 - Fig. 8

Back Panel Installation Instruction 1. Measure the distance of the back wall of the tub (corner to corner) The distance is “W” See Fig. 1 for det

Seite 9

3. Measure the side walls from the corner to the front point where the Side panel (01) is going to end. This distance is “D”. See Fig. 3 for deta

Seite 10 - Rev 1.6

Fig. 5 5. Attach the Center cover (05) vertically at the center point along the line and mark the drilling holes throu

Seite 11

Fig. 7 6. Attach the Corner cover (04) to the corner of the wall and mark the drilling holes through the predrilled hole

Seite 12 - Product Maintenance

Rev 1.6 1 VISION SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products

Seite 13 - QWALL TUB

Fig. 9 7. Determine the position of both Back panels (02). NOTE: a) Narrow side of the Back panel cannot be trimmed and

Seite 14 - Preparation

8. Place the Back panel (02) on a flat piece of plywood or a particle board. Cut the side end of the Back panel by making a few deep scratches with

Seite 15 - Packing List

9. Mount the Center cover (05) to the center of the back wall using the Countersunk screws ST4.2×30 (07). Do not tighten the screws. Leave the Cent

Seite 16 - Rev 1.1

11. Slide the right edge of the left Back panel (02) all the way behind the Center cover (05) and push the Back panel against the wall. You can adju

Seite 17

13. Align both Back panels at the top and tighten the screws on the Center cover (05) to secure this assembly in place. See Fig. 17 and Fig. 18 for

Seite 18

14. Determine the position of both Side panels (01). NOTE: a) Narrow side of the Side panel cannot be trimmed and should face the corner of the s

Seite 19

Fig. 21 16. Place the marks on the Side panel (01) which is going to the side wall with the fixtures according to the t

Seite 20 - Fig. 10

Fig. 23 17. Apply the sealant to the back surface of the Side panel (01). Apply the sealant around the drilled holes a

Seite 21 - Fig. 12

18. Slide the edge of the Side panel (01) all the way behind the Corner cover (04) and push the Side panel against the wall. Align the top of the Sid

Seite 22 - Fig. 14

19. Apply the sealant to the back surface of the Side panel (01) for another side wall installation. See Fig. 27 for details.

Seite 23 - Fig. 16

Rev 1.6 2Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in t

Seite 24 - Fig. 18

Fig. 29 21. Fasten tight the Corner covers (04) and the Center cover (05) to secure the Side panels (01) and the Back p

Seite 25 - Fig. 20

22. Use decorative plugs to cover the screw holes in the Corner covers (04) and the Center cover (05). See Fig. 29 for details.

Seite 26 - Fig. 22

Tub Glass Shelves Installation Instruction 24. Find the desirable height for the Glass shelves (09) and mark the locations on the wall. NOTE: The G

Seite 27 - Fig. 24

Rev 1.1 21 10. Mount the Glass brackets (10) to the wall using the Countersunk screws ST4.2×30. NOTE: padded set screw of the Glass bracket should be

Seite 28 - Fig. 26

Rev 1.1 22 Product maintenance To insure long lasting life for your acrylic back walls, wipe them off after each use with a soft cloth. To clean the

Seite 29 - Fig. 28

DREAMLINE™EXCLUSIVELIMITEDWARRANTYASOFMAY6,2013Thiswarrantyextendsonlytotheoriginalowner/end‐userforhouseholduse onlyandisn

Seite 30 - Fig. 29

TEL: 866-731-8378 – 215-957-1411 FAX: 866-227-9245 – 215-893-1780 WWW.BATHAUTHORITY.COM Rev 1.1 24For more infor

Seite 31 - Fig. 30

Rev 1.6 3Detailed Diagram of Shower Door Components 1234568910111213141516177 Packing List 01 Glass profile 2pcs 10 Round head screw ST4.2×30

Seite 32 - Fig. 32

Rev 1.6 4Shower Door Installation 1. Measure the distance between two walls. This distance is marked as “W”. See Fig. 1 for details.

Seite 33 - Fig. 34

Rev 1.6 5 Fig. 3 3. If the Guide rails (03) have been cut, you will need to reinstall the roller stoppers on each Guide rail

Seite 34 - Product maintenance

Rev 1.6 6 4. Fasten the bottom Guide rail (03) to the Glass profiles (01) with the Round head screws ST4.2x25 (11). See Fig. 5 for details.

Seite 35 - DREAMLINE

Rev 1.6 7 6. Slightly tap the Single side strips (09) in between the Stationary glasses (05) and the Glass profiles (01) using wooden shim or other p

Seite 36 - BATHAUTHORITY.COM

Rev 1.6 8 9. Move the finished frame to the designated position on the shower base, the bathtub or the threshold (depending on your installation); pu

Kommentare zu diesen Handbüchern

Keine Kommentare