DreamLine DL-6107C-01FR Installationsanleitung

Stöbern Sie online oder laden Sie Installationsanleitung nach Nein DreamLine DL-6107C-01FR herunter. DreamLine DL-6107C-01FR Installation Guide Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 53
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Infinity-Z Shower Door, Base & Wall Kit
S
HOWER
Door
,
S
HOWER
B
ASE AND
B
ACKWALLS
KIT I
NSTALLATION
INSTRUCTIONS
IMPORTANT
DreamLine
TM
reserves the right to alter, modify or redesign products at any time
without prior notice. For the latest up-to-date technical drawings, manuals or any
other details please refer to the support.BathAuthority.com
web page.
STEP 1: Install Shower Base
Shower Base Installation Instructions
STEP 2: Install Shower Backwalls
Shower Backwalls Installation Instructions
STEP 3: Install Shower Door
Shower Door Installation Instructions
Please read these instructions carefully before installing. If you have any questions regarding
installation, please call our technical support specialists Monday through Friday 9:00 AM 5:00
PM EST at Phone:
1-866-731-2244, Fax: 1-866-227-1533 or e-mail our technical support
group at
support@BathAuthority.com.
For more information on DreamLine Shower Kit please visit www.BathAuthority.com
Seitenansicht 0
1 2 3 4 5 6 ... 52 53

Inhaltsverzeichnis

Seite 1 - INSTRUCTIONS

Infinity-Z Shower Door, Base & Wall Kit SHOWER Door, SHOWER BASE AND BACKWALLS KIT INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves t

Seite 2 - INFINITY-Z

“INFINITY-Z” Rev.2 Ver.4 08/2013 9 11. Attach the Towel bar (18) to the Stationary glass (05). NOTE: Towel bar must be installed on the outside

Seite 3 - PLEASE, NOTE!

“INFINITY-Z” Rev.2 Ver.4 08/2013 10 13. Slide the top door wheels into the top Guide rail (03). Push the bottom wheels in the bottom Guide rai

Seite 4 - Packing List

“INFINITY-Z” Rev.2 Ver.4 08/2013 11 15. Do the final adjustments of the assembled unit in the Wall profiles. Drill the holes in the Wall Profile

Seite 5 - Shower Door Installation

“INFINITY-Z” Rev.2 Ver.4 08/2013 12 Product Maintenance To ensure long lasting life for your acrylic back walls, wipe them off after each us

Seite 6 - Fig. 4

Ver. 1, Rev. 1 QWALL – 5.2 (2 Back Panels) SHOWER ACRYLIC WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify

Seite 7

Ver. 1, Rev. 1 2Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are inclu

Seite 8 - Fig. 8

Ver. 1, Rev. 1 3Detailed Diagram of Acrylic Shower Wall Components 10958"- 62"46"- 50"56784213 Packing List 01 Side panel 2pcs

Seite 9

Ver. 1, Rev. 1 4Preparation for Installation of Back Panel 1. Place a mark on the walls at a distance of 1” (one inch) from the corner and draw a p

Seite 10 - Fig. 12

Ver. 1, Rev. 1 5 3. Divide the measurement “W” by two and place a mark in the center of the back wall and from there draw a plumb vertical line from

Seite 11 - Fig. 14

Ver. 1, Rev. 1 6 5. Measure the Back Panel (09). Width of the Back Panel has to be less than or equal to the distance between the center line and the

Seite 12 - Fig. 16

INFINITY-Z SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at a

Seite 13 - Product Maintenance

Ver. 1, Rev. 1 7 7. Place the Back Panel (09) onto a flat piece of plywood or particle board. Use a sharp industrial knife and a T-square to score al

Seite 14 - 5.2 (2 Back Panels)

Ver. 1, Rev. 1 8Preparation for Installation of Side Panels ATTENTION: See Fig. 9 for details. Fig. 9 8. Measure the side wa

Seite 15 - Tools Required

Ver. 1, Rev. 1 9 9. Determine the position of both Side panels (01). NOTE: a) The narrow edge of the Side panel fits behind the corner cover and

Seite 16 - Ver. 1, Rev. 1

Ver. 1, Rev. 1 10 Fig. 13 11. Take exact measurements of the fixture on the wall: • from the 1” (one inch) line in the cor

Seite 17 - Fig. 1

Ver. 1, Rev. 1 11 12. Determine which Side panel (01) will be installed on the side wall with the fixture. Mark the fixture location on the Side panel

Seite 18

Ver. 1, Rev. 1 12Acrylic Back Panel and Side Panel Installation Instruction 14. Attach the Center cover (10) vertically at the center point along the

Seite 19

Ver. 1, Rev. 1 13 Fig. 19 16. Attach the Corner cover (02) to the corner of the shower and mark the drilling holes thro

Seite 20 - Fig. 8

Ver. 1, Rev. 1 14 Fig. 21 ATTENTION: 17. Apply the sealant to the entire surface of the reverse side of the Back panel (0

Seite 21 - Fig. 10

Ver. 1, Rev. 1 15 18. Slide the right edge of the left Back panel (09) all the way behind the Center cover (10) and push the Back panel against the wa

Seite 22

Ver. 1, Rev. 1 16 19. Mount the Corner cover (02) to the corner of the shower using the Countersunk screws ST4.2×30 (07). Do not fully tighten the scr

Seite 23

“INFINITY-Z” Rev.2 Ver.4 08/2013 2Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the n

Seite 24

Ver. 1, Rev. 1 17 21. Slide the narrow edge of the Side panel (01) behind the Corner cover (02). Align trimmed edge of the Side panel (from Step. 9)

Seite 25 - Fig. 18

Ver. 1, Rev. 1 18 23. Once all panels are aligned, fasten tight the Corner cover (02) to secure the Side panels (01) and Back panels (09). Cover the s

Seite 26 - Fig. 20

Ver. 1, Rev. 1 19 ATTENTION; Prior to the next step, please be sure the part of the wall for installation of the Decorative edge molding (03) is clea

Seite 27 - Fig. 22

Ver. 1, Rev. 1 20Glass Shelves Installation Instruction 27. Determine the desired height for the Glass shelves (05) and mark the locations on the wa

Seite 28 - Fig. 24

Ver. 1, Rev. 1 21 29. Mount the Shelf brackets (04) to the wall using the Countersunk screws ST4.2×30 (07). NOTE: the padded set screw of the Glass b

Seite 29 - Fig. 26

Ver. 1, Rev. 1 22 Product maintenance To insure long lasting life for your acrylic back walls, wipe them off after each use with a soft cloth. To

Seite 30 - Fig. 28

SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign

Seite 31 - Fig. 30

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 2Preparation 1. Examine boxes and packages for shipping damage. Carefully remove Shower base from th

Seite 32 - Fig. 32

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 3SINGLE THRESHOLD SHOWER BASE Center Drain Configuration MODEL SPECIFICATION D (in) W (in)

Seite 33 - Fig. 34

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 4Left-Hand Drain Configuration MODEL SPECIFICAT

Seite 34 - Fig. 36

“INFINITY-Z” Rev.2 Ver.4 08/2013 3Detailed Diagram of Shower Door Components Packing List 01 Glass profile 2pcs 10 Round head screw ST4.2x

Seite 35 - TABLE OF CONTENTS

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 5Right-Hand Drain Configuration

Seite 36 - SLIMLINE SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 6NEO SHOWER BASE MODEL SPECIFICATION W (in) A (in) B (in) C (in) DLT-2

Seite 37 - Preparation

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 7QUARTER ROUND SHOWER BASE MODEL SPECIFICATION W (in) C (

Seite 38 - SINGLE THRESHOLD SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 8DOUBLE THRESHOLD SHOWER BASE Corner Drain Configuration MODEL SPECIFICATION W (in) C

Seite 39

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 9Left-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in)

Seite 40

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 10Right-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in)

Seite 41 - NEO SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 11Diagram of the Shower Base in a Cross Section Finished Wall Cement board S

Seite 42 - QUARTER ROUND SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 12Shower Base Installation Preparation 1. Ensure that the floor and the studs are at right angle. Pr

Seite 43 - DOUBLE THRESHOLD SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 132. Install the shower drain (NOT PROVIDED) according to the drain installation manual (supplied wit

Seite 44

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 14 4. Level the tray and place marks on the studs above the upper edge of the tile flange. See

Seite 45

“INFINITY-Z” Rev.2 Ver.4 08/2013 4Shower Door Installation 1. Measure the distance between two walls. This distance is marked as “W”. See Fig.

Seite 46

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 15 6. After the bedding material has been poured and before it sets, place the shower base into the p

Seite 47

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 16 Fig. 9 Product maintenance To insure long lasting life

Seite 48

DREAMLINE™EXCLUSIVELIMITEDWARRANTYASOFMAY6,2013Thiswarrantyextendsonlytotheoriginalowner/end‐userforhouseholduseonlyandisnottr

Seite 49

TEL: 866-731-2244 FAX: 866-227-1533 WWW.BATHAUTHORITY.COM For more information on DreamLineTM Shower Doors please visit www.Bath

Seite 50

“INFINITY-Z” Rev.2 Ver.4 08/2013 5 Fig. 3 3. If the Guide rails (03) have been cut, you will need to reinstall roller stop

Seite 51

“INFINITY-Z” Rev.2 Ver.4 08/2013 6 4. Secure the bottom Guide rail (03) to the Glass profiles (01) with the Round head screws ST4.2x25 (10). See

Seite 52 - WARRANTYSERVICE

“INFINITY-Z” Rev.2 Ver.4 08/2013 7 6. Slightly tap the Single side strip (08) in between the glass and the glass profile using wooden shims or ot

Seite 53 - BATHAUTHORITY.COM

“INFINITY-Z” Rev.2 Ver.4 08/2013 8 9. Move the finished frame to the designated position on the shower base, the bathtub or the threshold (depend

Kommentare zu diesen Handbüchern

Keine Kommentare